View Single Post
  #2  
Old 12-08-2001, 09:31 AM
stevebfl stevebfl is offline
Moderator
 
Join Date: Mar 2000
Location: Gainesville FL
Posts: 6,844
They are spread around the evaporator/heater case.

Behind the glove box is the row of switchover valves that control them. You will need a good vacuum schematic. Just disconnect the line of proper color for each unit to be tested and apply vacuum to it. If it holds the element is probably good. The linkage occasionally become disconnected so running the blower and watching the changing function will finish verification.
__________________
Steve Brotherton
Continental Imports
Gainesville FL
Bosch Master, ASE Master, L1
33 years MB technician
Reply With Quote