View Single Post
  #7  
Old 02-21-2017, 08:39 PM
Charlie Foxtrot Charlie Foxtrot is offline
Registered User
 
Join Date: Jan 2015
Location: northern IL
Posts: 267
2.2 sounds correct. IIRC it took me about 20-30 minutes per shock on the lift w/air tools & smoke wrench. The backs took a little longer than the fronts. If you have a good safe floor jack, jack stands & a set of metric wrenches you can do it in your drive on a sunny afternoon.
Reply With Quote