View Single Post
Old 08-05-2003, 09:32 PM
Posts: n/a
ok, got word from the machine shop. There were 12 small cracks and many pits from corrosion.
I had a few M129 heads easily avalible but I thought i'd just have them recondition it. That way the number of 250SE engine heads don't diminish
Should be ready by the end of the week
Reply With Quote