View Single Post
  #2  
Old 11-15-2003, 08:07 PM
stevebfl stevebfl is offline
Moderator
 
Join Date: Mar 2000
Location: Gainesville FL
Posts: 6,844
You will have to replace all the gears and all the rails. The pieces are all available separately from numerous sources.

This job will stress a DIYer. It is a 25 hour job requiring the removal of the front timing cover and some amount of the pan. I have heard of techs who pull the motor to do the job. Lots of things to go wrong.
__________________
Steve Brotherton
Continental Imports
Gainesville FL
Bosch Master, ASE Master, L1
33 years MB technician
Reply With Quote