PeachParts Mercedes-Benz Forum

PeachParts Mercedes-Benz Forum (http://www.peachparts.com/shopforum/)
-   Diesel Discussion (http://www.peachparts.com/shopforum/diesel-discussion/)
-   -   LBJ replacement on W210 ('98E300)- So easy, a cave man could do it! (http://www.peachparts.com/shopforum/diesel-discussion/346639-lbj-replacement-w210-98e300-so-easy-cave-man-could-do.html)

ROLLGUY 11-21-2013 06:00 PM

LBJ replacement on W210 ('98E300)- So easy, a cave man could do it!
 
I replaced both lower ball joints on my friends '98 E300 today. From the time the wheels left the shop floor on the lift till they touched the ground, was just about 28 minutes. Only a few tools were needed. This is one of the most mechanic friendly ball joint jobs I have done. If I had my camera handy, I would have taken photos and posted a how-to. However, a cave man could do this job, so a how-to may not be necessary.....Rich

sixto 11-21-2013 06:38 PM

In other words, it's so easy it's worth considering Uro brand ball joints! I imagine cavemen had better sense :)

Sixto
87 300D

ROLLGUY 11-21-2013 06:59 PM

Quote:

Originally Posted by sixto (Post 3242942)
In other words, it's so easy it's worth considering Uro brand ball joints! I imagine cavemen had better sense :)

Sixto
87 300D

Just say NO to URO! Lemforder all the way. Only $24 each prom PP.


All times are GMT -4. The time now is 11:57 AM.

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
Search Engine Optimization by vBSEO 3.6.0
Copyright 2024 Pelican Parts, LLC - Posts may be archived for display on the Peach Parts or Pelican Parts Website