Parts Catalog Accessories Catalog How To Articles Tech Forums
Call Pelican Parts at 888-280-7799
Shopping Cart Cart | Project List | Order Status | Help



Go Back   PeachParts Mercedes-Benz Forum > Mercedes-Benz Tech Information and Support > Diesel Discussion

Reply
 
LinkBack Thread Tools Display Modes
  #1  
Old 09-12-2006, 10:07 AM
djoyce93
Guest
 
Posts: n/a
not too hot !

I have't driven my '86 300SDL much this summer but now that the cool weather has hit Canada I'm driving it every day. My problem is that I am getting very little heat out of my heater. Is it possible that I have a clogged heater coil? How would I unclog it? What else could it be? Thanks.

Reply With Quote
  #2  
Old 09-12-2006, 10:26 AM
TX76513's Avatar
Platinum Member
 
Join Date: Apr 2003
Location: Brandon, Mississippi
Posts: 5,209
Quote:
Originally Posted by djoyce93 View Post
I have't driven my '86 300SDL much this summer but now that the cool weather has hit Canada I'm driving it every day. My problem is that I am getting very little heat out of my heater. Is it possible that I have a clogged heater coil? How would I unclog it? What else could it be? Thanks.
My personal 02 cents would be to check your coolant level - if it's good then thump your mono valve with a rubber hammer, it's probably stuck and very common going into fall problem with mine.
__________________
BENZ THERE DONE THAThttp://www.peachparts.com/shopforum/...c/progress.gif
15 VW Passat TDI
00 E420
98 E300 DT
97 E420 Donor Car - NEED PARTS? PM ME!
97 S500
97 E300D
86 Holden Jackaroo Turbo D
86 300SDL
(o\|/o)
Reply With Quote
  #3  
Old 09-12-2006, 10:30 AM
redassag00's Avatar
I like OM603's
 
Join Date: Nov 2005
Location: Katy, TX
Posts: 1,243
Do you mean heater CORE?
__________________
91 350SD
14 F150 Eco
19 Fusion Hybrid
11 GT500
Reply With Quote
  #4  
Old 09-12-2006, 10:41 AM
djoyce93
Guest
 
Posts: n/a
Sorry, yes I meant the heater core! I will check the coolant level, where is the monovalve and what does it look like?
Reply With Quote
  #5  
Old 09-12-2006, 11:07 AM
Registered User
 
Join Date: Jun 2004
Location: West of Ft. Worth. TX
Posts: 4,186
The monovalve is between the firewalls, near the center and has a small 2-wire connector. Here is a link to a photo:http://catalog.eautopartscatalog.com/mercedesshop/sophio/wizard.jsp?partner=mercedesshop&clientid=catalog.mercedesshop&baseurl=http://catalog.peachparts.com/&cookieid=1W71C3A361W90NKHVR&year=1984&make=MB&model=300-SD-002&category=R&part=ACC+Mono+Valve&appChassis=_any

The most visible part is the plate with 4 small screws. There is a rebuild kit which is about the easiest job you will ever do on this car. Remove 4 screws, replace innards, & restore.
__________________
Sam

84 300SD 350K+ miles ( Blue Belle )
Reply With Quote
  #6  
Old 09-12-2006, 11:27 AM
djoyce93
Guest
 
Posts: n/a
I checked and my coolant is full, I'll give the monovalve a tap and see what happens. Hope it works, winters are real cold up here!
Reply With Quote
  #7  
Old 09-12-2006, 11:31 AM
djoyce93
Guest
 
Posts: n/a
By the way, could it be the heater core? And if it is, would flushing it make a significant difference?
Reply With Quote
  #8  
Old 09-12-2006, 11:36 AM
AlanTbird's Avatar
Registered User
 
Join Date: Jan 2006
Location: BELEN NM
Posts: 140
little or no heat

my 86 does the same thing!
I got a valve and a PUMP to put in it for this winter.
still 100 degrees here so I have time!

cheers
__________________
[B]AlanT
BELEN NM


93 dodge cummins truck~old reliable
01 Volvo AWD XC70 Turbo Wagon
74 450 SE on the way out!
Recent: 1972 Toronado 56k on the clock!

IF it plugs in, lights up, makes noise,
I'M ON IT!
Reply With Quote
  #9  
Old 09-12-2006, 02:16 PM
rrgrassi's Avatar
mmmmmm Diesel...
 
Join Date: Jun 2006
Location: Royse City Tx
Posts: 5,220
If the heater core is really plugged, a flush may not work. If it is plugged because some smart person used stop leak, then flushing it will remove the stop leak and allow coolant to visit your floorboard.

If your car has an AUX waterpump like the 123, check it's operation as well.
__________________
RRGrassi


70's Southern Pacific #5608 Fairmont A-4 MOW car

13 VW JSW 2.0 TDI 193K, Tuned with DPF and EGR Delete.

99 W210 E300 Turbo Diesel, chipped, DPF/Converter Delete. Still needs EGR Delete, 232K

90 Dodge D250 5.9 Cummins/5 speed. 400K

Gone and still missed...1982 w123 300D, 1991 w124 300D
Reply With Quote
  #10  
Old 09-12-2006, 02:44 PM
TX76513's Avatar
Platinum Member
 
Join Date: Apr 2003
Location: Brandon, Mississippi
Posts: 5,209
__________________
BENZ THERE DONE THAThttp://www.peachparts.com/shopforum/...c/progress.gif
15 VW Passat TDI
00 E420
98 E300 DT
97 E420 Donor Car - NEED PARTS? PM ME!
97 S500
97 E300D
86 Holden Jackaroo Turbo D
86 300SDL
(o\|/o)
Reply With Quote
  #11  
Old 09-12-2006, 04:13 PM
Waitn For The Bus All Day
 
Join Date: Jul 2004
Location: south east pa.
Posts: 1,786
At what temp does the car run when fully warmed up?

My 240 had the same problem but it was the t-stat remaining open.

Cheers,

Bill
Reply With Quote
  #12  
Old 09-12-2006, 04:43 PM
Registered User
 
Join Date: Jul 2005
Location: Rantoul, IL
Posts: 68
I've had this problem

It got real cold here suprisingly and my heat just quit working. sometimes it would start but it would never get real warm. I replaced the thermostat and viola! i have heat now. its a cheap fix if thats a problem and if it hasnt been replaced in the last five years it might be a good idea to replace it now.
Reply With Quote
  #13  
Old 09-13-2006, 07:50 AM
djoyce93
Guest
 
Posts: n/a
Unfortunately the problem is not the thermostat, the engine hits proper operating temp with a few minutes. Is the heater core behind the dash?
Reply With Quote
  #14  
Old 09-13-2006, 10:36 AM
Registered User
 
Join Date: Jun 2004
Location: West of Ft. Worth. TX
Posts: 4,186
Yes.........

the heater core is behind the dash. Removal would be a major PIA. That would be the last thing I would go for unless someone has used, as mentioned before, mass quantities of stop-leak. Usually I have found that heater cores have a problem with leaks not blockage.

In order of cost and suspicion, I would try:
monovalve
solder joints in ACC controller
aux. water pump
__________________
Sam

84 300SD 350K+ miles ( Blue Belle )
Reply With Quote
  #15  
Old 09-13-2006, 05:20 PM
Waitn For The Bus All Day
 
Join Date: Jul 2004
Location: south east pa.
Posts: 1,786
Quote:
Originally Posted by djoyce93 View Post
Unfortunately the problem is not the thermostat, the engine hits proper operating temp with a few minutes. Is the heater core behind the dash?
Sorry to hear that. Was hoping for the best for you.

Sounds like the core is a PITA. Just make sure thats the problem before you tear into it.

Cheers,

Bill

Reply With Quote
Reply

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On
Trackbacks are On
Pingbacks are On
Refbacks are On




All times are GMT -4. The time now is 07:26 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
Search Engine Optimization by vBSEO 3.6.0
Copyright 2024 Pelican Parts, LLC - Posts may be archived for display on the Peach Parts or Pelican Parts Website -    DMCA Registered Agent Contact Page