PeachParts Mercedes-Benz Forum

PeachParts Mercedes-Benz Forum (http://www.peachparts.com/shopforum/index.php)
-   Tech Help (http://www.peachparts.com/shopforum/forumdisplay.php?f=1)
-   -   Anybody have a labor guide that can tell me how long a few things should take.... (http://www.peachparts.com/shopforum/showthread.php?t=308412)

BigRed0803 11-16-2011 05:29 PM

Anybody have a labor guide that can tell me how long a few things should take....
 
2003 SL 55 AMG

Anyone know the labor time on the following jobs:

Both motor mounts
Tandem power steering pump

Dealer told me one thing and I just want a second opinion

Solid Snake 11-16-2011 06:00 PM

Quote:

Originally Posted by BigRed0803 (Post 2829353)
2003 SL 55 AMG

Anyone know the labor time on the following jobs:

Both motor mounts
Tandem power steering pump

Dealer told me one thing and I just want a second opinion

Alldatapro tells me 6.8/7.1 hours on the mounts, 6.1 on the pump.


All times are GMT -4. The time now is 05:08 PM.

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
Search Engine Optimization by vBSEO 3.6.0
Copyright 2024 Pelican Parts, LLC - Posts may be archived for display on the Peach Parts or Pelican Parts Website