Parts Catalog Accessories Catalog How To Articles Tech Forums
Call Pelican Parts at 888-280-7799
Shopping Cart Cart | Project List | Order Status | Help



Go Back   PeachParts Mercedes-Benz Forum > Mercedes-Benz Tech Information and Support > Tech Help

Reply
 
LinkBack Thread Tools Display Modes
  #1  
Old 08-08-2003, 02:52 PM
Registered User
 
Join Date: Apr 2002
Location: Surrey, Uk
Posts: 254
Don't know, Haynes manual just says 'the procedure is very complex'.

However, for other engine types (earlier KE Jetronic systems fitted to M102/3 engines in E class) it says that after disconnecting the cable you prise off the ball joint and move the guide lever until the roller rests against the idle speed end stop. then adjust the length of the rod so it fits without any tension.

The difference with yours is that there are two rods in the linkage with a bell crank. If you don't get it right then the rate at which the throttle opens in relation to the tension in the transmission cable will be wrong and you won't get the right quality shift.
__________________
Mick J
'08 Chrysler 300CRD (MB OM 642 engine)
'95 E220 estate
'89 230TE (R.I.P.)
Reply With Quote
Reply

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On
Trackbacks are On
Pingbacks are On
Refbacks are On




All times are GMT -4. The time now is 06:49 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
Search Engine Optimization by vBSEO 3.6.0
Copyright 2024 Pelican Parts, LLC - Posts may be archived for display on the Peach Parts or Pelican Parts Website -    DMCA Registered Agent Contact Page