1. Shampoo Carpets (monday a.m.)
2. Install rear headrests (mounting hardware should arrive late next week)
3. Replace steering gear box (early Aug.)
4. Adjust valves and flush & replenish all fluids (early Aug.)
5. Recharge A/C (early Aug.)
6. Install front dome light w/map light feature (whenever I get around to purchasing)
__________________
Nate
1995 E420
1992 BMW 525i
1984 300D Turbo sold
1993 Volvo 244 sold
1995 Volvo 944T R.I.P!
"The details are not details. They make the product."
-Charles Eames
www.cbs.nu
|