View Single Post
  #5  
Old 10-30-2001, 05:10 PM
MIKE FREEMAN
Guest
 
Posts: n/a
MAKE A TEST LEAD WITH A 15 AMP FUSE INLINE.
DISCONNECT THE PLUG AT THE CHANGE OVER SWITCH AND FIND THE 1.5MM WIRE (RED W/YELLOW TRACER.)PLUG YOUR TEST LEAD INTO THAT WIRE AND CONNECT THE OTHER END TO BATTERY POS.
WITH THE BLOWER SWITCH ON HIGH (POS. 3)BLOWER SHOULD WORK IF MOTOR IS GOOD AND SWITCH IS GOOD.
IF BLOWER IS STILL IN/OP GROUND THE 1.5MM. GREEN W/BLACK WIRE AT A/C MOTOR.THIS WILL BY-PASS THE SWITCH.
IF IT STILL WON'T BLOW THEN YOU CAN START CUSSING!
MF
Reply With Quote