View Single Post
  #4  
Old 06-12-2008, 11:45 AM
Johnt49 Johnt49 is offline
Registered User
 
Join Date: May 2006
Location: Old Town, Fl
Posts: 350
Open all valves while pumping down. (The port valves are opened by turning clockwise). Leave port valves open, close high & low valves on manifold, turn off vac pump in that order. Observe vacuum on gauges. It should hold steady. If it drops you've got a leak. Technically you only need to open one side, either high or low, to evacuate since it's one looped system, but most techs prefer to open both.
__________________
82 300SD 202K
82 300SD 233K
83 300TD 340K
82 300TD 98k euro (parts on the hoof)
85 300TD 282K
83 300TD 197K
Reply With Quote