View Single Post
  #3  
Old 02-02-2010, 01:36 PM
ah-kay ah-kay is online now
Registered User
 
Join Date: Mar 2009
Location: San Diego
Posts: 3,592
My design concept

Main tank -WVO, holding tank - Diesel.

T the feed just before the primary filter with a 3 way valve. Normally default to main WVO tank. On the way to stop the car for the night, I will press a button in the car and a timer will start. Valve is switched to diesel and the remaining WVO is used up in the IP, filter and hard lines. When I start the car the next day, car will start on and run on diesel for a short time ( whatever diesel is in IP, filter etc ) as the new feed is defaulted to WVO again. I just want to have an electronic circuit to do the timing for me but the timing does not need to be precise.
__________________
Not MBZ nor A/C trained professional but a die-hard DIY and green engineer. Use the info at your own peril. Picked up 2 Infractions because of disagreements. NOW reversed.

W124 Keyless remote, PM for details. http://www.peachparts.com/shopforum/mercedes-used-parts-sale-wanted/334620-fs-w124-chasis-keyless-remote-%2450-shipped.html

1 X 2006 CDI
1 x 87 300SDL
1 x 87 300D
1 x 87 300TDT wagon
1 x 83 300D
1 x 84 190D ( 5 sp ) - All R134 converted + keyless entry.
Reply With Quote