View Single Post
  #1  
Old 04-02-2014, 10:21 PM
triacon triacon is offline
Registered User
 
Join Date: Mar 2008
Location: Pittstown, NJ
Posts: 210
we're subframe removal 1985 Mercedes 300sd

so I have read a number of information messages regarding removal, and they usually mentioned using three floor jacks. I have two Floor jacks and a six ton bottle jack. can I use the bottle jack under the diff and the two floor jacks in the trailing arm locations to safely remove the sub frame? I need to replace at least one trailing arm bushing, as well as a complete rear brake overhaul.
__________________
1985 300SD

Last edited by triacon; 04-03-2014 at 10:52 AM.
Reply With Quote