View Single Post
  #20  
Old 10-15-2023, 09:17 PM
dave33333 dave33333 is offline
Registered User
 
Join Date: Oct 2009
Posts: 8
I love it Scooter, it's my 3rd w123

Work so far includes:
5 new tires incluing the spare
Painted all 5 wheels
New heavy duty bilstein shocks up front
new accumulators
flushed suspension fluid and replaced filter
new calipers, pads, hoses up front
new pads and hoses in the rear
new brake master cylinder
new seals and pistons in the rear brake calipers
New transmission mount
New rear axles
New fan belts
New battery
New steering damper
All new bulbs everywhere
New headlights with LED bulbs
Reamed glow plug holes and replaced glow plugs
Diesel purge with all new filters and the cigar hose
New tailgate struts
Replaced seals on tailgate and front doors

Still need to replace:
Lifters
Engine timing chain
Rebuild turbocharger
Replace inlet manifold
Find exhaust leak
New seals for rear doors
New actuators for doors
New master lock switch
Replace HVAC dampers behind dash
New engine mounts
Replace oil cooler hoses
Reply With Quote