Parts Catalog Accessories Catalog How To Articles Tech Forums
Call Pelican Parts at 888-280-7799
Shopping Cart Cart | Project List | Order Status | Help



Go Back   PeachParts Mercedes-Benz Forum > General Discussions > Off-Topic Discussion

 
 
LinkBack Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 08-07-2021, 11:55 PM
cmac2012's Avatar
Renaissances Dude
 
Join Date: Dec 2004
Location: Redwood City, CA
Posts: 35,959
Spend 278 days to build a dream waterpark

Common English would perhaps go with “spent.” But the guys who made this are Thai, at least that is what is said in the description.

Sort of wild, not sure what to believe about some of it, but it is a kick to watch.

No idea about the medium they are digging in. I’ve read of some types of stone that are relatively easy to carve. But that stuff looks like it’s too easy to carve and retain that shape and support weight as well.

I know that underneath topsoil in many places is a layer referred to as “hardpan.“ It’s a serious PITA To dig in, I’ve never gotten very far into it, never had any desire or need to do so.

The final result does look sort of nifty, the hard part would be keeping that water from stinking like hell.

https://youtu.be/d6QXxMDp7Zg

Last edited by cmac2012; 08-08-2021 at 09:44 PM.
Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On
Trackbacks are On
Pingbacks are On
Refbacks are On




All times are GMT -4. The time now is 10:00 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
Search Engine Optimization by vBSEO 3.6.0
Copyright 2024 Pelican Parts, LLC - Posts may be archived for display on the Peach Parts or Pelican Parts Website -    DMCA Registered Agent Contact Page