View Single Post
  #7  
Old 11-06-2005, 12:22 AM
t walgamuth's Avatar
t walgamuth t walgamuth is online now
dieselarchitect
 
Join Date: Apr 2005
Location: Lafayette Indiana
Posts: 38,970
rings

require a complete teardown of the engine. if hired about 1500 labor for a five, including resleeving, decking, skimming the head, cam chain and or guides for same rebuilding the oil pump, vac pump, valve job, valve guides, testing springs, and much more. not something to be done lightly as the parts are prob over 1000 now with the exchange rate. dont forget the r and r of the motor and prob motor mounts (optional) and misc other hoses belts etc.

its not the rings that cost you its the "while you're at it"s that cost the most.

tom w
__________________
[SIGPIC] Diesel loving autocrossing grandpa Architect. 08 Dodge 3/4 ton with Cummins & six speed; I have had about 35 benzes. I have a 39 Studebaker Coupe Express pickup in which I have had installed a 617 turbo and a five speed manual.[SIGPIC]

..I also have a 427 Cobra replica with an aluminum chassis.
Reply With Quote