|
Progress Unmeasured
Her mechanic has fixed all her electrical woes and the head was reworked with new factory valves and seals. She had a lot of C buildup on the old valves. Inside the cylinders she looks unworn as the fingerprints on CYL walls are still evident.
One rear axle half shaft was corroded to the wheel bearing and needed hammering to free, damaging the rotor WTF. Her new name is "GREEN PIT"
__________________
sophie2 
1987 300TD, 168K
1981 300D 220K
1968 250S W115 Diesel Converted,
2006 E320 CDI
2006 Yanmar 3YM30 / Vindo Sloop
29 Vintage Bicycles
|