|
My press was more than adequate, a 20 ton model.
Here's a few pictures. Job is done!
Photo 1 old and new arm
#2 Use of tie rod separator to pull off the sway bar link
#3 Use of a pipe to drive on the sway bar link.
#4 new control arm
#5 tightening up the new ball joint to the lower control arm. A 5mm allen wrench has to be cut short to do this task. That's what they make Craftsman tools for!
Steve
|