Replacing some broken sections is pretty cut and dry as opposed to laying an entire run. Hopefully your is a straight run no branches. I referenced the National Clay Pipe Institute, they have everything you need to know to becoming the best ditch digger and pipe layer in town, Line and Grade, connections, trench widths, bedding. Anyways they are at ncpi.org