|
kindof expensive.
but if it saved the garage it would be a good deal.
on my other office building the sewer ran under a parking lot that was 8" thick concrete with steel rebar. and of course it was clay and of course it was partly collapsed and so every few years i had to have it jetted out. tearing out the concrete was cost prohibitive. i also would have had to set a manhole in the alley. so the jetting every so often seemed a bargain.
tom w
__________________
[SIGPIC] Diesel loving autocrossing grandpa Architect. 08 Dodge 3/4 ton with Cummins & six speed; I have had about 35 benzes. I have a 39 Studebaker Coupe Express pickup in which I have had installed a 617 turbo and a five speed manual.  [SIGPIC]
..I also have a 427 Cobra replica with an aluminum chassis.
|