View Single Post
  #3  
Old 10-30-2006, 09:25 AM
al76slc al76slc is offline
Registered User
 
Join Date: Mar 2006
Posts: 201
Gilly

Done. Took about 20 minutes following your directions. Thanks.

However, I was left with one concern. The original weatherstripping was cut at the A pillar about 2 feet up from the floor. The new one came from the dealer as a continuous loop (the bond was visible). When I installed it, I wound up with about 3/4" excess material. So I removed the 3/4", kept the cut at the A pillar, and it fit fine.

The continuous loop seems to make more sense from an integrity viewpoint. Why would I have to cut it to make it fit properly? Couldn't the loop be made 3/4" shorter?

Thanks
Al
Reply With Quote