View Single Post
  #3  
Old 05-08-2007, 06:48 PM
tjohn tjohn is offline
Registered User
 
Join Date: Feb 2002
Location: Virginia
Posts: 550
The only way this jobs stretches out that long is if everything on the car is rusted through. I did this job in two hours total, and probably could do it a bit faster if I ever have to do it again. This was on a lift with air tools such as a professional would have. It sounds like you have a good relationship with this guy, I've got to think that he just doesn't realize how easy this swap is. I too used CVJs btw, and I'm quite happy with them.
__________________
Tjohn

82 300 SD
77 450 SL (gone)
Reply With Quote