View Single Post
  #3  
Old 10-05-2008, 09:21 PM
chilcutt's Avatar
chilcutt chilcutt is offline
Anywhere I Roam
 
Join Date: Mar 2008
Location: Singapore
Posts: 15,074
Quote:
Originally Posted by mpolli View Post
I have a Zoeller M53

http://www.zoeller.com/zcopump/products/sumpeff/50series.htm

It was in the house when I bought it. The output pipe screws into a 1.5" NPT thread at the base of the pump which I think is pretty standard for these. I am replacing the output pipe because whoever installed it glued the pipe into the threaded fitting crooked, and unfortunately it was leaning toward the float, and the float would collect a little soap scum and then stick against the pipe and not work.

Anyway, I removed the old output pipe (1.5" ABS) and I noticed that they had drilled a 1/8" hole about 8" from the base (8" up from where it connects to the pump). Is this standard practice? I cannot find any installation instructions on the Zoeller site.

Thanks
leave the hole,or drill another one on new discharge-pipe. It is standard practice. It is to reduce back-pressure. Chilcutt-liscenced plumber
Reply With Quote