View Single Post
  #14  
Old 04-01-2009, 04:54 PM
ramonajim ramonajim is offline
Redefining normal daily
 
Join Date: Jul 2004
Location: Frederick, MD
Posts: 445
Present. At least most of me is physically

April shall be The Month of Reconstruction on The Cottage for Ma and Ed. Got all the destruction done (me thinks) and ready to start bolting things back together. Found a contractor to help out with the addition of a bath upstairs (time is flying by fast enough we just might have to trade dollars for hours and let the contractor do stuff we'd hoped to do ourselves), and Darling Wife actually starting painting the downstairs last weekend.

Then all we have to do is actually move Ma & Ed. Given their serious pack rat type issues, that'll be all kinds of fun.....

Oh, and by the end of April we'll be down to 4 weeks left to get our house ready for the FHA inspection. And we've got a good 8 weeks worth of part time work left to do on it.

In June we sleep.
__________________
1961 220b: first project car - sold.
2000 CLK 430: first modern Benz - sold.
2001 CLK 55: OMG the torque!!! - sold
1972 280SE 4.5: Baby Gustav
1991 300TE 4Matic: Gretel the Snow Bunny - sold
1978 300SD: Katz the Free Man - given away
1980 Redhead: Darling Wife
Reply With Quote