View Single Post
  #3  
Old 07-09-2011, 06:53 PM
npk npk is offline
Registered User
 
Join Date: Jul 2009
Posts: 45
Quote:
Originally Posted by porkface View Post
55nm, start to finish, wait, 1st 90, start to finish, wait, 2nd 90, start to finish. done. good luck, chuck.

Does this mean that I have to loosen all the bolts before starting this (55nm, +90, +90)procedure?


But wouldn't loosen all the bolts(nothing to hold the head down to the block) may shift the head and cause the gasket (which has already set-in for several years) to tear/break?
Reply With Quote