|
Surprise!
The Hydro/Thermo Engineers in Stuttgart have designed the Cooling System/Passages/Thermostat Housings in an "Maze" configuration such
that the Thermos have Three distinct Operational Phases.
1.Closed
2.Variable/Bypass
3.WOT
(With what we've learned about German Engineering in the last Hundred Years
the Systems are designed to default/Fail "Open".
__________________
'84 300SD sold
124.128
|