Microsoft Excel question
I have a project to do for a class and it's a cost benefit analysis.
I have one page with what should be variables
ex
currentPwrcost current power cost per KWH
currentServerPwr current server power usage
newServerPwr calculated server power usage for the new server
I have a column to the left of the variables that I have the values in.
How do I make it so I can use these variables on another page for the current cost per year and then the projected cost with the new setup
(I have a bunch of other variables these are just an example)
I am running Excel 2007
thanks guys
|