Djet system
All resistance checks must be conducted with the ignition off.
Injectors:
Individually check ECU harness pins 3, 4, 5 and 6 to ground. Resistance should be less than 25 ohms, but not zero. NOTE: The ECU powers the injectors with a 3V signal lasting between 2 and 5 milliseconds. This signal cannot be measured with a meter; don't try.
Trigger Points:
ECU harness pin 12 to 21, then pin 12 to 22 = near 0 ohm continuity on one set, open on the other. Rotate engine 360 degrees and test again. Readings should be opposite.
and I suspect you have checked all fuses and fuel start relays?
__________________
Ron
2015 Porsche Cayman - Elizabeth
2011 Porsche Cayman - Bond,James Bond
Sadly MERCEDESLESS - ALways LOOKING !
99 E320 THE Queen Mary - SOLD
62 220b - Dolly - Finally my Finny! Sadly SOLD
72 450SL, Pearl-SOLD 
16 F350 6.7 Diesel -THOR
19 BMW X5 - Heaven on Wheels
14 38HP John Deere 3038E Tractor -Mean Green
84 300SD, Benjamin -SOLD
71 220 - W115-Libby ( my first love) -SOLD
73 280 - W114 "Organspende" Rest in Peace
81 380 SL - Rest in Peace
|