|
There is a check valve between the pump and line going to the poster.
First however, you need to determine how much vac is being produced. Connect a vacuum gauge to one of the orificies with the other blocked off, then check the other. You should get ~22 inHg on one and ~15inHg on the other.
__________________
83 SD
84 CD
|