View Single Post
  #14  
Old 06-11-2021, 01:58 AM
ah-kay ah-kay is offline
Registered User
 
Join Date: Mar 2009
Location: San Diego
Posts: 3,540
No grid, no power. It is to sync the incoming AC phase for grid tied system otherwise you can't feed power back to the grid. Grid tied solar with battery backup is more expensive and payback period is long.

Whatever you do, DON'T lease a system.
__________________
Not MBZ nor A/C trained professional but a die-hard DIY and green engineer. Use the info at your own peril. Picked up 2 Infractions because of disagreements. NOW reversed.

W124 Keyless remote, PM for details. http://www.peachparts.com/shopforum/mercedes-used-parts-sale-wanted/334620-fs-w124-chasis-keyless-remote-%2450-shipped.html

1 X 2006 CDI
1 x 87 300SDL
1 x 87 300D
1 x 87 300TDT wagon
1 x 83 300D
1 x 84 190D ( 5 sp ) - All R134 converted + keyless entry.
Reply With Quote