Quote:
Originally posted by psfred
Also, try leaving the black (ground) lead free, ungrounded -- on my cheapo meter, ti get 90-100% duty cycle with the black leak grounded. If left free, with the red leak in the #3 connetor, it works fine. Go figure!
Peter
|
Wow I didnt know that. You tend to completely trust the numbers these meters give you. I get a 96.7% duty cycle. I will check this.