|
The Bowden cable, control pressure cable controls shift timing, early or late shifts in the 722. 3, 722.4, 722.5 transmissions as well as part throttle kick down shifts, WOT kick down shifts is controlled by the kick down solenoid which is activated by the switch under the gas pedal.
Disconnect the Bowden cable from the throttle linkage then Adjust the throttle cable/ gas pedal cable first, make sure you have wide open throttle when you depress the gas pedal to the floor, next Adjust the control pressure cable so the ball can be installed without any tension or looseness in the cable; fine tune the cable to your shift liking on a road test or by the book.
Full Throttle Kick down
1-2 2 -3 3-4 1-2 2-3 3-4
E 24km 55km 100km 58km 101km 157km
S 39km 92km 149km 58km 101km 157km
__________________
|