View Single Post
  #5  
Old 08-28-2005, 04:46 PM
stevebfl stevebfl is offline
Moderator
 
Join Date: Mar 2000
Location: Gainesville FL
Posts: 6,844
The three sections of the gauges assemble one over the other through the back of the cluster. The ground is made through physical contact and often just needs a loosening and retightening of the screws. The actual ground is carried through the gauges to the harness that plus in. I have seen the trace burned on the final printed circuit to the plug. I have seen separate ground wires applied under the assembly screws.
__________________
Steve Brotherton
Continental Imports
Gainesville FL
Bosch Master, ASE Master, L1
33 years MB technician
Reply With Quote