Parts Catalog Accessories Catalog How To Articles Tech Forums
Call Pelican Parts at 888-280-7799
Shopping Cart Cart | Project List | Order Status | Help



Go Back   PeachParts Mercedes-Benz Forum > Mercedes-Benz Tech Information and Support > Diesel Discussion

 
 
LinkBack Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 06-19-2008, 09:56 PM
Registered User
 
Join Date: Feb 2003
Location: Oklahoma
Posts: 1,081
2mm lift method - I can not figure out what I am doing wrong!

I am following the tutorial to the letter and when I rotate the engine, my dial indicator needle does not move!! It appears that with the number 1 valve pointing straight up - which is where you start this procedure from - that is the highest point the valve travels. I have the gauge set up, setting on top of the valve keeper - dial indicator needle set at 0 - and everything is tight. Valve lash removed...

What am I not doing right here?


ryan
__________________
RG Newell

1984 300D
1972 250
1986 560SL
1991 300CE
Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On
Trackbacks are On
Pingbacks are On
Refbacks are On




All times are GMT -4. The time now is 01:21 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
Search Engine Optimization by vBSEO 3.6.0
Copyright 2024 Pelican Parts, LLC - Posts may be archived for display on the Peach Parts or Pelican Parts Website -    DMCA Registered Agent Contact Page