|
Reading the signal at the round connector requires a meter capable of reading a duty cycle. Ideal ratio is approx 50% on/off
Reading the signal at the EHA requires a ammeter. Ideal reading is +- .1-.2ma.
__________________
MERCEDES Benz Master Guild Technician (6 TIMES)
ASE Master Technician
Mercedes Benz Star Technician (2 times)
44 years foreign automotive repair
27 Years M.B. Shop foreman (dealer)
MB technical information Specialist (15 years)
190E 2.3 16V ITS SCCA race car (sold)
1986 190E 2.3 16V 2.5 (sold)
Retired Moderator
|