Parts Catalog Accessories Catalog How To Articles Tech Forums
Call Pelican Parts at 888-280-7799
Shopping Cart Cart | Project List | Order Status | Help



Go Back   PeachParts Mercedes-Benz Forum > General Discussions > Off-Topic Discussion

 
 
LinkBack Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 04-14-2010, 11:53 PM
cmac2012's Avatar
Me, Myself, and I
 
Join Date: Dec 2004
Location: Redwood City, CA
Posts: 36,485
Lathe and plaster merged into sheetrock.

Or maybe vice versa would make more sense as that would imply that the sheetrock is new and the lath and plaster old (duhhh).

Nice house in Marin, I'm guessing 20s or 30s - lath and plaster - studs are 3.75 x 2 - knob and tube wiring. I'm knocking out one wall to merge the master bedroom in Unit A with the bedroom in Unit B. This is about the nicest 2 unit house I've ever seen, not a duplex - unit A is a deluxe 2 bedroom while unit B is a deluxe studio.

I'll have to heal over the stub where the old wall and ceiling were and I damn sure don't want to shorten an apprenticeship at lath and plaster from 2 years to 3 days.

My first instinct is to use paper and hot mud over the joint tween the plaster and the rock, and sand and re-coat like I was enjoying myself.
__________________
Te futueo et caballum tuum

1986 300SDL, 362K
1984 300D, 138K
Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On
Trackbacks are On
Pingbacks are On
Refbacks are On




All times are GMT -4. The time now is 03:23 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
Search Engine Optimization by vBSEO 3.6.0
Copyright 2024 Pelican Parts, LLC - Posts may be archived for display on the Peach Parts or Pelican Parts Website -    DMCA Registered Agent Contact Page