#1
|
||||
|
||||
|
Quote:
If I start at Zero and I rotate the engiine till the Valve is pushed down 2mm I get a 2mm reading not 1mm. If you have time would you read the German Instructions you have and see if it is not an error in the Engilish Translation.
__________________
84 300D, 82 Volvo 244Gl Diesel |
|
#2
|
||||
|
||||
|
Quote:
Quote:
If you start with the DTI set at zero the valve drops down - the probe stays at the same height. The DTI is still at zero because it doesn't measure negative displacement. You need to apply enough pre-load on these DTIs to make sure you have enough distance within the gauge to allow for the 2mm measurement. Because as far as the gauge is concerned you have to measure backwards. You could in principle pre-load your DTI to 10mm and then drop the measurement on the little needle within the large scale to 8mm You could start at 6.5 and drop down to 4.5 on the little scale etc etc etc Each time you do this however it helps to "zero" the big needle so that you can easily see each whole mm change. Sorry to go on! Another way of thinking about it => The big needle sweeps round twice for a 2mm change in distance at the probe. The little needle within the gauge just moves a bit...
__________________
1992 W201 190E 1.8 171,000 km - Daily driver 1981 W123 300D ~ 100,000 miles / 160,000 km - project car stripped to the bone 1965 Land Rover Series 2a Station Wagon CIS recovery therapy! 1961 Volvo PV544 Bare metal rat rod-ish thing I'm here to chat about cars and to help others - I'm not here "to always be right" like an internet warrior Don't leave that there - I'll take it to bits! |
|
#3
|
||||
|
||||
|
Quote:
I am used to only looking at the big Pointer and counting the revolutions or where the big Pointer moves to. I generally don't pay attention to the smaller dial and pointer because the amount I normally measure is in thousands of an inch (not used to the Metric stuff) so I am not used to the Large Pointer Moving much. The Dial Indicators I have for this sort of thing have a minimum of 1 inch or more of plunger travel. If I did this job I would normally have the Plunger pushed up into the Indicator/preloaded randomly just slightly past 3mm of preload (I would watch the large Pointer to see I got 3mm+ of preload movement) and I would zero the Indicator and watch the Large Pointer movement as the Valve goes down till I saw the large Pointer reached 2mm of movement. One of the Dial Indicators I have has a 1/4" (6.35mm) total plunger range and it does not have the smaller Dial on it; see the pic. I can do the Job with that dial Indicator but I cannot follow the Instructions with it because there is no smaller dial on it.
__________________
84 300D, 82 Volvo 244Gl Diesel Last edited by Diesel911; 03-15-2014 at 06:55 PM. |
![]() |