Parts Catalog Accessories Catalog How To Articles Tech Forums
Call Pelican Parts at 888-280-7799
Shopping Cart Cart | Project List | Order Status | Help



Go Back   PeachParts Mercedes-Benz Forum > Mercedes-Benz Tech Information and Support > Mercedes-Benz Performance Paddock

Reply
 
LinkBack Thread Tools Display Modes
  #1  
Old 08-30-2014, 01:51 PM
Registered User
 
Join Date: Jan 2012
Posts: 7,534
With all the bell housing gyrations going around in this and other threads, has anyone investigated redrilling a drawn steel "blow proof" housing? There has to be one that has the front to rear correct spacing to make it work.

The MB pattern could be drilled on the outer flange, if any bolts are inside the flange, a tube could be welded through the bell to allow attachment.

Going farther, an aftermarket flywheel maker should be able to drill a FW to a MB pattern.

I'm thinking modify aftermarket parts rather than modifying / adapting MB to fit aftermarket parts.
Reply With Quote
Reply

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On
Trackbacks are On
Pingbacks are On
Refbacks are On




All times are GMT -4. The time now is 02:54 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.
Search Engine Optimization by vBSEO 3.6.0
Copyright 2024 Pelican Parts, LLC - Posts may be archived for display on the Peach Parts or Pelican Parts Website -    DMCA Registered Agent Contact Page